Changes between Version 8 and Version 9 of ITC 371 Project Management


Ignore:
Timestamp:
12/04/13 18:59:23 (11 years ago)
Author:
FightingMongooses
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ITC 371 Project Management

    v8 v9  
    1515This project would require a web server (Apache), a PHP handler (phpMyAdmin), and a functional SQL database similar to those used in MySQL Community Server.
    1616
     17=== System Constraints ===
     18The primary issue created by handling data this way would that the data is initially put in by users.   Although data checking can be done for correct format, it would be very difficult to verify that an address is correct.  Also, the person reporting the issue may not be physically on site.  This would also create problems with pulling GPS information from a cell phone.  The constraint would be that location information would need to be accurate for the system to be effective with geo-tagging.
     19
    1720[[Image(Sahana Eden Ticketing System.jpg)]]
    1821Resource Tagging Graphical Representation
    1922
    20 === System Constraints ===
    21 The primary issue created by handling data this way would that the data is initially put in by users.   Although data checking can be done for correct format, it would be very difficult to verify that an address is correct.  Also, the person reporting the issue may not be physically on site.  This would also create problems with pulling GPS information from a cell phone.  The constraint would be that location information would need to be accurate for the system to be effective with geo-tagging.
    22 
    2323----
    2424BluePrint