wiki:BluePrint/EmergencyMedicalRecords/ProjMgnt

Version 23 (modified by modaresi, 11 years ago) ( diff )

--

Project Managment

Introduction

In the countries with a lot of disasters there must be some kind of Disaster Management System. In most third world countries unfortunately that is just not the case. When it is, it is for after the disaster happens only, which is too late. It would be much better if the system works for both before and after disasters.

Project Description

The module that this group will be working on is called Disaster Medical Records. It is useful for managing patient data during rescue/first aid operation. It is vital especially for countries which have lots of natural disasters but lack any patient data collection system to be able to help them as quickly and efficiently as possible. It could be used for virtually any country; of course they could customize it to their own specifications. This module will include some very important features such as tag, photograph, triage status, relevant diagnoses, and statistics. It will be able to communicate this information with the hospitals, for more serious patients who need to be transferred to hospital. The data will be placed on secure servers with 24*7 back-up. The information will be permanent until the person dies.

Requirements

Entrypoint A - Triage Zone:

  • Tag Label Assignment / Label Handling (Barcode, QR?, RFID?)
  • Photograph
  • Classification (Age Group, Sex)
  • Triage Status

Entrypoint B - First Aid / Treatment Zone:

  • Patient Tracking
  • Personal Data / Contact Data
  • Vital Values
  • Relevant Diagnoses / Classification
  • Emergency Interventions
  • Emergency Lab Data (if applicable)

Reporting Point - Regular Hospital Admission:

  • Patient Tracking
  • Patient Registration
  • Reporting
  • Data Transfer to other Medical Record Systems
  • Statistics

Tasks

user case

Design

http://www.4shared.com/download/9GvN_zpI/Emergency_Management.png

This is a simple diagram of the final module.

http://www.4shared.com/download/K48x1DRF/Diagram.png

Quality Control

To ensure quality control we made three set of survey question. One for each stage. Beginning, middle, and end. We used question pro and Kwiksurveys because their free version had limitations, so by utilizing both we were able to make a kind of surveys we wanted.

This is the first question asked from the stakeholders in the beginning. http://www.4shared.com/download/9Wlch8Td/QuestionPro-Survey-3703774-PDF.png

This survey is like the one above except this time made by Kwiksurveys.

http://www.4shared.com/download/9jWk2iqp/Untitled.png

This survey was also asked in the beginning but from some of the people that this module is being created for.

http://www.4shared.com/download/ThyvHYcQ/Untitled__1_.png

This survey was asked in the middle of project.

http://www.4shared.com/download/L5mJHpg6/Untitled__2_.png

And this is the last survey created right after the module was finished.

http://www.4shared.com/download/2g28KP8A/Untitled__3_.png

Time Table

While you can make the Gantt chart by even pen and paper, however it is much better to use some kind of project management software. There are quite a few out there, but we are already familiar with Linux and Libre suit. So we used ProjectLibre.

http://www.4shared.com/download/c_Akd-VI/Final_Project-0.png http://www.4shared.com/download/bq3wifZt/Final_Project-1.png http://www.4shared.com/download/DCIB7tKa/Final_Project-2.png http://www.4shared.com/download/Owt6j8le/Final_Project-3.png

Time Table

Note: See TracWiki for help on using the wiki.