Changes between Version 19 and Version 20 of Event/2012/GSoC/MessageParsing


Ignore:
Timestamp:
06/17/12 14:15:30 (12 years ago)
Author:
Ashwyn
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Event/2012/GSoC/MessageParsing

    v19 v20  
    9999||The msg_log data model is tweaked.|| Completed ||
    100100||process_log() is put in place to schedule the parsing of inbound messages.||Completed||
    101 ||Parsing Workflow layout is drafted|| In Progress||
    102 ||Link the different inbound sources to workflows||In Progress||
     101||Parsing Workflow layout is drafted|| Completed||
     102
     103
     104Second Trimester:
     105
     106||= SMART Goal =||= Status =||
     107||Parsing Rules moved from modules/s3msg.py to private/templates/default/parser.py||Completed||
     108||msg_workflow data model defined.||Completed||
     109||Import parsing workflow tasks to s3msg.py||Completed||
     110||Link the different inbound sources to workflows||Completed||
    103111
    104112=== Timeline ===
     
    106114
    107115||= Due Date =||= SMART Goal =||= Measure =||
    108 ||(24th April  - 7th May)||Development of the workflow handling module s3parsing.py starts.||1.Community bonding period 2.Decision to outline the template.||
    109 ||(8th May – 21st May)||1.The msg_workflow data model is developed. 2.S3ParsingModel starts to take shape.||Code committed locally.
     116||(24th April  - 7th May)||Development of the workflow handling module s3parsing.py starts.||*Community bonding period.\\*Decision to outline the template.||
     117||(8th May – 21st May)||1.The msg_workflow data model is developed.\\ 2.S3ParsingModel starts to take shape.||Code committed locally.||
    110118
    111119Second Trimester:
    112120
    113121||= Due Date =||= SMART Goal =||= Measure =||
    114 ||28th May  -*(won’t be available due to university exams )|| ||
    115 ||4th June||1.CERT:Deployment Request SMS Handler development starts ( critical requirement of the project).2.Parsing workflow is developed.||SMS response processing starts to take shape.||
    116 ||11th June||CERT:Deployment Request SMS Handler development continues ( critical requirement of the project).||1.Code committed locally.2.Tested on local system.||
    117 ||17th June||1.process_log() method is designed. 2.Tweaks in msg_log implemented.||Code committed to trunk.||
    118 ||2nd July||1.Parsing workflow is chained to process_log(). 2.Sources are linked to respective workflows.||Code committed to trunk.||
    119 ||8th  July||1.Clickatell functionality is developed for eden. 2.Clickatell allows for a more robust testing mechanism. 3.Commits are altered with mentor feedback and suggested changes.||1.Commits so far tested thoroughly.2.Bug fixing. 3.Code committed to trunk.[Mid-Term evaluations :-) ] ||
     122||28th May  -*(won’t be available due to university exams )|| || ||
     123||4th June||1.CERT:Deployment Request SMS Handler development starts ( critical requirement of the project).\\ 2.Parsing workflow is developed.||SMS response processing starts to take shape.||
     124||11th June||CERT:Deployment Request SMS Handler development continues ( critical requirement of the project).||1.Code committed locally.\\2.Tested on local system.||
     125||17th June||1.process_log() method is designed.\\ 2.Tweaks in msg_log implemented.||Code committed to trunk.||
     126||2nd July||1.Parsing workflow is chained to process_log().\\ 2.Sources are linked to respective workflows.||Code committed to trunk.||
     127||8th  July||1.Clickatell functionality is developed for eden. \\2.Clickatell allows for a more robust testing mechanism.\\ 3.Commits are altered with mentor feedback and suggested changes.||1.Commits so far tested thoroughly.\\2.Bug fixing.\\ 3.Code committed to trunk.[Mid-Term evaluations :-) ] ||
    120128 
    121129 
     
    123131
    124132||= Due Date =||= SMART Goal =||= Measure =||
    125 ||15th July||1.Integration with templates folders. 2.Development of post-install UI (CRUD interface admin panel).||Code committed locally.||
    126 ||22nd July||1.Routing mechanism to resources. 2.Save search and subscription implemented for msg_log.||Code committed to trunk.||
    127 ||29th July||1.OpenGeoSMS (process_opengeosms() ) routine is tweaked and linked with the respective parsing methods. 2.The existing functionality in the Android Client is tested .||Code committed to trunk.||
    128 ||5th August||1.Integration of the IRS module for incident reporting through SMS.2.The functionality is extended to other modules (if needed). 3.Feedback from mentors.||Code committed locally.||
    129 ||13th August||1.System testing & Bug fixing. 2.Final changes to the code are applied.||1.Project reaches final stage. 2.Bug fixes 3.Final Code committed to trunk.||
     133||15th July||1.Integration with templates folders.\\2.Development of post-install UI (CRUD interface admin panel).||Code committed locally.||
     134||22nd July||1.Routing mechanism to resources.\\ 2.Save search and subscription implemented for msg_log.||Code committed to trunk.||
     135||29th July||1.OpenGeoSMS (process_opengeosms() ) routine is tweaked and linked with the respective parsing methods.\\ 2.The existing functionality in the Android Client is tested .||Code committed to trunk.||
     136||5th August||1.Integration of the IRS module for incident reporting through SMS.\\2.The functionality is extended to other modules (if needed). \\3.Feedback from mentors.||Code committed locally.||
     137||13th August||1.System testing & Bug fixing.\\ 2.Final changes to the code are applied.||1.Project reaches final stage.\\ 2.Bug fixes \\3.Final Code committed to trunk.||
    130138||20th August||PENCILS DOWN||Project Completed. :-)||
    131139
     
    134142
    135143Fridays 13:00 UTC
    136