Changes between Version 39 and Version 40 of Event/2012/GSoC/Translation
- Timestamp:
- 07/09/12 11:28:00 (13 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Event/2012/GSoC/Translation
v39 v40 49 49 ||= Due Date =||= SMART goal =||= Measure =||= Status =|| 50 50 ||||||'''First trimester (24 April - 20 May)'''|| 51 || 17 May ||Work on retreival of all the relevant strings inside T(...) from the ".py" files and store the result in a file with complete location(file name and line number information). || The required strings are correctly recieved when tested on eden python files || Completed ||51 || 17 May ||Work on retreival of all the relevant strings inside T(...) and M(...) from the ".py" files and store the result in a file with complete location(file name and line number information). || The required strings are correctly recieved when tested on eden python files || Completed || 52 52 ||||||'''Second trimester (21 May - 9 July)'''|| 53 53 || 28 May || Identify the categorization of modules in Eden by studying the file structure and dependencies || Retreived strings can be appropriately assigned module(s). || Completed ||