Project: Workflow Support
Name : Hardik Juneja
Mentor: Dominic Konig
BluePrints
This project draws ideas from the Blueprints below:
Workflow Tutorial
Demo
Meetings And Discussions
Weekly Meeting : Wednesday 8:15 UTC
Venue : IRC (Nick - hardikj)
Google Group Discussions :
- https://groups.google.com/d/msg/sahana-eden/XJkb0iL-w5Y/rrxV-6WHrMQJ
- https://groups.google.com/d/msg/sahana-eden/uWXty9xQiqg/499xcRDGky0J
Goals -
- configuration of event handlers (nodes) in a workflow (done)
- storing and retrieving of workflow instances
- mapping of instance status + current event to a certain node
- Interface between workflow engine (=event manager) and workflow nodes (=event handler)
- Interface between nodes and "actions" (=S3Methods?)
- Workflow widgets (=widgets for users to perform workflow actions), and how to put them into a page
Project Progress
SMART Goal | Measure | Status |
---|---|---|
Designed Workflow Configuration | Discussed the design with mentors and we came up with a good design. | Completed |
Implement Required classes | Implemented all required basic classes which were necessary to make a good cofiguration pattern | Completed |
Testing | Test the configuration pattern | Completed |
Document and make new Blueprint | http://eden.sahanafoundation.org/wiki/BluePrint/WorkflowSupport | Completed |
Discussing design of the data model | done successfully | Completed |
Implement the data model | designed the model | Completed |
Implement functions to store and retrieve status | Implemented all basic functions | Completed |
Testing and documentation | Tested the database | Complete |
Mapping instances | We have a working basic Workflow Engine | Completed |
design wireframes and update wiki | http://eden.sahanafoundation.org/wiki/BluePrint/WorkflowSupport#Wireframes | Completed |
Node and status Matching | - | Completed |
Injecting the Work-flow Id in action buttons and forms | Injected | Completed |
Support the Prep and Postp Injection | Configuration support postp and prep | Completed |
Discussion on framework for workflow action and UI items | decided to have wheader to inject workflow UI | Completed |
Allow adding workflow header for the workflow | Implemented | Completed |
Make a Default workflow header with injected buttons | add next and exit button | Completed |
Add progress bar | added a bar on top | Completed |
pretify the UI | added css rules | Completed |
Allow injection of text through configuration | changed configuration pattern | Completed |
Set up Demo and get ready for evaluations | - | In progress |
Proposal Timeline:
May 28th - june 15th (Community Bonding Period)
- Achieving all the learning goals described in the Outputs and clearing all the doubts with the community.
- Gathering all my prerequisite about the project and laying down a modular structure of the project.
June 17th - July 29th (Pre Community bonding Period)
Week 1:
- Discussing the design to save user progress. ( On the Page )
- Creating models (if required ) to save the user progress so that if a user quit accidently he can restore his work. The saved progress will also be used as step name.
- Discussing and planning the design of the project with mentors and community.
Week 2 and 3: ( Configuration of event handlers (nodes) in a workflow )
- Design a configuration pattern (done)
- Implement the classes for the configuration pattern
- Testing and documentation
- Meeting 1 - Code review, Making changes(if suggested), Writing tests , Trunk integration (Wednesday).
Week 4 and 5: ( storing and retrieving of workflow instances )
- Discussing and plan the Design of the data model
- Implement the data model
- Testing and documentation
Week 6 and 7: ( mapping of instance status + current event to a certain node )
- Design the process
- Implement the functions
- Testing & Documentation
- Mid-Term Evaluation.
July 29th - August 2nd
- Through revision of what have been done till now and lay a plan for next phase.
- Fixing all issues/bugs(if any).
August 3rd - September 16th (Post Community Bonding Period )
Week 8 and 9: - interface between workflow engine (=event manager) and workflow nodes (=event handler)
- Design
- Implement it
- Test and document it
- Meeting 2 - Code review,Suggestions, Applying changes(if any), Trunk Integration.
Week 10 and 11: ( interface between nodes and "actions" (=S3Methods?) )
- review the configuration pattern
- design and implement the interface
- test and document
Week 12 and 13:
- figure out how to inject the workflow widgets
- implement it
- document it
September 17th - September 23rd (Pen down period)
- Thorough review of all the functionalities.
- Debugging, Code cleanup, Comments.